Brunswick Valley Flood History...


Menu

HOME

INTRODUCTION

BACKGROUND

FACTS

MAPS

DOCUMENTS

PHOTOS

PRESS

LATEST UPDATES
MEDIA FILES

CONTACTS



Documents

These documents were compiled over the past 30 years to create a paper trail to surface the truth.

During this time I have uncovered decisions that I believe were not made in the best interest of the community.

Significant Government and Ratepayers monies have been wasted with no positive results being achieved for the affected community.

There has however been a disastrous cumulative increase in flood levels on the affected community residing on the Marshalls Creek Flood Plain.

Jim Mangleson

 

click on icon above
Latest Flood Information
as at April, 2017

RESOURCE MATERIAL

Attachments
PDF Files

Flood Story 3
Shire Engineers Report '76

Flood Story 4

Letter from Council '91

Flood Story 5
Attachment letter
to story 4 from Council '91

Flood Story 7
Adopted Plan Lie

Flood Story 6
Council accepts liability

Flood Story
Council Minutes 1976

Flood Story 8
Bond Bridge Letter

Flood Story 13
Censored public version
Cranston Report

Flood Story 15
Levy bank height SGB

Flood Story 17
Keep report confidential

Flood Story 18
Levee bank built 1 m higher

Flood Story 20
Webb McEwan Dredge

Flood Story 21
MCFPC Costings

Flood Story 22
Warnings MPWorks

Flood Story 23
PWD report on Breakwall

Flood Story 27
Prof Warner Report RB Wall

Flood Story 38
Councils letter to OS Developers

Flood Story 40
JM extract from book

Flood Story 41
JM foreword to booklet

Flood Story 42
JM Booklet Cover

Flood Story 46
Rainfall Charts '44 - '87

Flood Story 49
Concern with MCFPC 1992


 

 

Website Provider Disclaimer. While every effort has been made to ensure the information on this site is correct, it is not always possible to achieve complete and total accuracy.
Therefore we accepts no responsibility for any loss or damages which may occur to any persons as a result of information obtained from this site.